Heavy haulage

Agricultural and construction machinery transport

Each job is a project: real weight, gauge, permits, lashing and one contact until the receiver signs the delivery note.

The haul in three acts

From enquiry to signed delivery note

We do not move a machine “like any other truck”. We ask for technical data and return a viable route — or a justified no.

01

Enquiry

Origin, destination, machine and loading window. Within 24–48 working hours you know if the job is viable.

02

Route and papers

Real measurements, itinerary, ACC and escort when needed. Itemised quote, no opaque lines.

03

Loading and delivery

Certified lashing, tracking and a signed delivery note. One contact end to end.

Operating process

Nine stages, one contact

Each stage leaves a trail: measurements, permits, contract and delivery note.

01

Briefing and feasibility

We collect origin, destination, loading window and machine type. Within 24–48 working hours we confirm if the job is viable or needs a special convoy.

Brand, model, weight, L×W×H

Site hours and access

Ordinary, special or exceptional load

02

Inspection and real measurements

We do not quote from a brochure. We measure or validate the datasheet, turning radii and tracks or tyres.

Real weight with bucket and counterweights

Track width and height with cab

Photos of access and ramps

03

Route engineering

We plot the itinerary with bridges, roundabouts, tolls and regional limits.

Bridge and overhead gauges

Axle calculation

Rest points and escort

04

Permits and escorts

Special-transport authorisations with DGT / regions and escort when required.

ACC if masses or dimensions are exceeded

Notices to road owners

Pilot or police escort

05

Itemised quote

Tractor unit, kilometres, permits, tolls, insurance, crane and waiting. No opaque lines.

Empty and loaded km

Support crane or dismantling

Validity and cancellation

06

Contract, insurance and stamp

We formalise the job with a transport contract. The PDF carries letterhead, party details and company stamp.

Third-party liability

CMR on international jobs

Working document, not a qualified signature

07

Load preparation

Certified lashing, chocks, ramps and anchor points.

Straps and tensioners

Cab and glass protection

Checklist signed at origin

08

Transit and tracking

One contact reports departure, incidents and ETA.

Departure notice

Delays and checks

CMR / customs file

09

Delivery and incidents

Unloading to the same safety standard. The receiver signs the delivery note.

Joint inspection and photos

Reservation on the delivery note

Invoice and archived contract

Fleet

The trailer is chosen for the machine, not the other way round

Lowbed

For excavators, bulldozers and tracked machines. Lowered deck to respect maximum height.

Machine carrier

Farm tractors, backhoe loaders and compact machines on short or medium national hauls.

Modular / exceptional

Loads beyond gauge or GVW: modular trailers and a civil-works study.

EU international

CMR consignment note, VAT/Intrastat and unloading at site, dealer or port.

Documents

Incomplete papers mean an unsafe route

Datasheet / CE

Weight, dimensions and serial number.

Machine insurance

If it travels under own means or the policyholder requires it.

Site access permit

Hours, site contacts and street restrictions.

Lifting instructions

Lifting points and whether it can be started for loading.

Client tax details

Legal name, tax ID and billing address.

Exact destination

Coordinates or a sketch if there is no clear postal address.

Need machinery transport?

Give us origin, destination, weight and dimensions. We confirm feasibility within 24–48 working hours.